In 2019 our engineers worked with BADGE Constructions to design, build and deliver a new special school based in Caboolture, located near the existing Caboolture State High School. More than $24 million is set to be invested in the construction of the school, to eventually accommodate up to 280 secondary students from Years 7 to 12.

The new school was opened to teachers and students in Term 1 in 2020 with an administration building, three general learning spaces, a library, and a fully functioning home economics learning area.

Our team are excited to, once again, assist with the design and construct of the second stage of the school. This includes a new, two-storey learning centre and a shared hall for Lee Street Special School and Caboolture State High School.