Client: Brisbane Grammar School
Completed: May 2013
Brisbane Grammar School is a long standing provider of education and learning for Brisbane boys. In order to further improve the level of education for students, new facilities like the Lilley Centre are essential.
The Brisbane Grammar School has a long history of providing young minds with access to the highest levels of education. The new Lilley Centre represents a physical and symbolic shift from a dated and distant library and learning centre to a modern and captivating centrepiece for the school and city. This contemporary learning facility includes an extensive library, learning rooms and high tech multimedia installations.
Multitech Solutions began design work on this iconic structure by first completing a full site inspection and establishing exactly what was needed by our client. Our Mechanical team then began the process of redesigning the existing ventilation and air conditioning systems. This was a valuable experience that allowed our dedicated engineers to improve upon the existing system and optimising it to reduce overall environmental impact and running costs. This was done by installing the latest in energy efficient air conditioning services and directing airflow to enhance the new system’s effectiveness.
Improving environmental friendliness through energy efficiency is an achievement that Multitech Solutions aims to reach with every project we undertake. The Mechanical services provided at the Brisbane Grammar School Lilley Centre attained this goal as well as reducing the overall running costs.